Arbour Lake


 

 

Available space and available modules determine the size of the layout. Usually it takes about two hours to unpack, join and level the modules and be ready to run.

When we are set-up and running we enjoy visiting with our visitors and pointing out highlites and details of our display.

< back  

 


Bow Valley Model Railroad Club, Calgary - 2026